The Wenlock Project

LocationBOSDEN FARM
The Wenlock Project — BOSDEN FARM
Duration
20 weeks on site

A full-house renovation in Bosden Farm that reconfigured the existing layout to give the family more usable space. We turned a 4-bedroom house into 3 larger bedrooms and a large family bathroom, fully renovated the kitchen, living room, hallway and downstairs WC, and carried out a complete rewire and replumb with new flooring throughout.

The story

The family needed more space from the existing 4-bedroom layout, so we reconfigured the first floor to create 3 larger bedrooms and a generous family bathroom, making every room work harder for how they actually live.

Downstairs, we fully renovated the kitchen, living room, hallway and downstairs WC, stripping each area back and rebuilding it with new finishes, fixtures and a layout that flows properly from the front door through to the garden.

Because the whole house was being opened up, we carried out a complete rewire and replumb at first-fix stage, then ran new flooring throughout to give the property one consistent finish from room to room.

Every trade was coordinated by us on one programme, so the work moved smoothly from structural and first-fix through to the final decoration and handover.

Project Gallery

Finished kitchen with breakfast bar, quartz worktops and LED feature lightingFinished dining area with panelled feature wall and herringbone flooringFinished hallway looking through to the kitchen with oak balustradeFinished hallway with oak doors, new staircase and herringbone flooringFinished downstairs WC with wall-hung vanity and herringbone flooringFinished living room with feature plaster wall and floating media unitFinished family bathroom with slatted panelling, bath and wall-hung basinWalk-in shower with lit niche, oak door and herringbone flooringRedecorated bedroom with new carpet and wall-mounted TVOak slatted feature wall with wall-mounted TVFinished fitted wardrobes with black bar handles and drawer bankBespoke shaker wardrobes fitted in a bedroom, awaiting handlesFamily bathroom mid-fit with tiled walls, lit niche and herringbone flooring being laidFamily bathroom being tiled with a lit shower niche and laser level set upRun of grey shaker units and larder installed during the kitchen fitBreakfast bar framed up with worktops being fitted in the new kitchenKitchen units set out with sink and worktop templating underwayTall units faced with grey shaker doors during the kitchen fitBespoke tall unit carcasses built to conceal the relocated boilerNew French doors fitted and the room boarded out ready for plasteringWide opening formed between the living space and kitchen, fully boardedKitchen area boarded out with first-fix pipework and wiring in placeLiving room wall hacked back to blockwork ready for replasteringFirst-fit electrics and plumbing in the stripped-out bathroomBedrooms stripped out with new partition studwork in placeNew stud partition framed to form the reconfigured bedroomsBedroom wall opened up during the four-to-three bedroom reconfigurationBathroom stripped back with floorboards up and pipework exposedNew stud partition framed in the living room during the reconfigurationFull row of acrow props and needles supporting the joists before the steelStructural opening propped with new blockwork pier being builtAcrow props supporting the ceiling with the wall hacked back to blockwork