ProjectsView project

The Cartmel Project

LocationHAZEL GROVE
The Cartmel Project — HAZEL GROVE
Duration
8 weeks on site

A kitchen-diner renovation in Hazel Grove that needed proper structural groundwork before the finishes could begin. We stripped the area back to brick where required, removed the wall between the kitchen-diner and living room and separated the living room off to create a defined, quieter space. We then excavated down to expose the existing foundations and water table, pumped out the water and poured a new concrete strip footing. A steel square frame was installed to carry the load from above, before we rewired and replumbed the kitchen-diner, relocated radiators, fitted a new Wickes kitchen with stone worktops and added a new window to bring in more natural light.

The story

The existing kitchen-diner needed more than a cosmetic update — the structure below had to be made safe before anything above could be changed. We started by stripping the area back to brick where necessary, then removed the wall between the kitchen-diner and living room and separated the living room off to give the family a quieter, more defined space away from the cooking area.

With the layout opened up, we excavated down to locate the original foundations and water table. Water in the excavation was sumped out before we poured a new concrete strip footing, giving the altered opening a solid base. A steel square frame was then installed to take the load from above, so the new kitchen-diner layout could be opened up with confidence.

Once the structural work was signed off, we rewired and replumbed the kitchen-diner, relocated the radiators to better positions and fitted a new Wickes kitchen. Stone worktops were templated and installed, and a new window was added to bring natural light deep into the finished room.

Every trade was coordinated by us on one programme, from the groundworks and steel through to the final kitchen fit, so the project moved smoothly from structural shell to a usable, finished space.

Project Gallery

Finished dining area with bay windows and herringbone flooringFinished kitchen run with induction hob and stone splashbackBreakfast bar with stools looking towards the hallwayOpen-plan view across the herringbone floor to the breakfast barStone-topped breakfast bar and tall units through the new openingFinished kitchen with black sink, oak shelving and stone worktopsKitchen units being set out against freshly plastered wallsKitchen-diner fully plastered with the new opening through to the bay windowNew opening boarded out and taped ready for plasteringSteel frame installed with new stud wall and floor opened upSteel goalpost frame in place with walls stripped back to brickSteel beam fitted with acrow props supporting the structure aboveAcrow props supporting the opening before the steel frame went inExcavation marked out below floor level to locate the foundationsTrench excavated down to the water table ready for the new strip footingSubmersible pump sumping water out of the excavation before pouring the footingExcavation filled with groundwater beside the existing brick footingsSeparated living room decorated and finished after the wall was removed

Something similar in mind?

How can we help?