The Chestnut Project

LocationSTAINES
The Chestnut Project — STAINES
Duration
3 weeks on site

A master bedroom in Staines taken back to bare walls and rebuilt as a boutique hotel-style suite. We reworked the layout so the store room is now accessed from a new opening, rewired and replastered the whole room, then built the centrepiece — a custom walnut floating bed with a bespoke full-width headboard, with walk-in wardrobes concealed behind the bed wall. Finished with a new radiator, new skirting boards and new flooring throughout.

The story

The brief was simple: make the master bedroom feel like a hotel suite rather than a box room with furniture in it. We started with a full strip-out back to bare walls and reworked how the space was used — the store room access was switched to a new opening so the main wall could be given over to joinery.

With the layout settled we rewired the room for the new lighting and socket positions, fitted a new door frame, then reboarded and plastered throughout to give a perfectly flat shell for the joinery to sit against.

The centrepiece is a custom walnut floating bed frame, built on site and paired with a bespoke full-width upholstered headboard that runs the length of the wall. Behind that wall we built walk-in wardrobes, so all the storage is hidden completely out of sight and the room stays calm and uncluttered.

A new radiator, new skirting boards and new flooring finished the job off, leaving a warm, considered bedroom that genuinely feels like somewhere you'd check into.

Project Gallery

Custom walnut floating bed with bespoke headboardFinished hotel-style bedroom with walnut floating bed and upholstered headboardFinished bedroom with new curtains and flooringFinished walk-in wardrobe with mirrored sliding doors and LED lightingWalnut slatted feature frame and mirrored wardrobes installedHeadboard wall boarded with wardrobe carcasses behindFloating bed platform boarded out with bedside tables set inTimber frame for the custom floating bed platformMDF headboard wall built and set out on siteNew door frame formed for the relocated store room accessBedroom stripped back with new stud partition framedWalls stripped back to brick ready for the rebuildBedroom cleared with skirtings removed and plaster hacked backOriginal master bedroom before the strip-out began